The Noriabad Power Plant, located near Nooriabad on the Karachi–Hyderabad Highway in Sindh, Pakistan, is an important energy infrastructure project developed to support the growing electricity demand of Karachi and nearby industrial areas. BuildEdge Innovations (construction company in Pakistan) contributed to the project through specialized construction and civil engineering works, supporting the development of reliable power infrastructure that helps reduce electricity shortages and strengthen economic growth in the region.
Construction of an 8-lac gallon capacity reservoir to support plant operations and cooling requirements.
Civil works carried out for the 100 MW Noriabad Power Plant supplying electricity to Karachi.
Project successfully completed within the 2024–2025 one-year timeline.
Demonstrates MAS Group’s capability in executing large-scale industrial infrastructure projects.
BuildEdge Innovations successfully executed major construction and infrastructure development projects at the Noriabad Power Plant in Karachi, a key energy facility located on the Karachi–Hyderabad Highway that plays a crucial role in supplying electricity to Karachi’s power network. The power plant comprises two 50-MW units with a combined generation capacity of approximately 100 MW, helping to strengthen the region’s energy infrastructure and reduce electricity shortages.
As part of this large-scale project, BuildEdge Innovations carried out specialized civil engineering and structural development works, including the construction of a high-capacity water reservoir with an approximate storage capacity of 8 lakh gallons. The reservoir was strategically developed to support the operational and industrial requirements of the power plant while ensuring durability, efficiency, and long-term performance through quality construction standards and modern engineering practices.